Press

A new railway standard

2012.02.24 - Ville, Rail & Transports (FR)

A revolution is underway in the world of rail transport. Since January 2012, trains 850 m long have been authorised to run on the French network. These longer trains can therefore take more lorries in the case of combined rail-road transport and thus reduce the number on our roads.

Read more